[00:00:01]
THERE WE GO. THE TIME IS 5:30.
[A. CALL TO ORDER]
A QUORUM IS PRESENT. DR.YES, MR. DAVIS. WE DID POST AND ADVERTISE THIS MEETING IN ACCORDANCE WITH THE LAW.
[C. CLOSED SESSION]
REAL PROPERTY AND 0.071 CONSULTATION WITH THE BOARD OF ATTORNEY AND 0.076 SECURITY.THANK YOU FOR YOUR NOTES, BY THE WAY.
[D. RECONVENE INTO OPEN SESSION]
WE'LL NOW RECONVENE IN OPEN SESSION.[E. INTRODUCTION OF MEETING]
COME FORWARD, PLEASE.GOOD AFTERNOON, PRESIDENT DAVIS, MEMBERS OF THE BOARD AND DR.
STINSON. IT GIVES ME GREAT PLEASURE TO INTRODUCE TWO OF THE FINEST STUDENTS OF SHANNON HIGH SCHOOL.
WOULD YOU PLEASE RISE? PLEDGE] OKAY. FIRST AND FOREMOST, I WOULD LIKE TO THANK THE BOARD AND ALL OF THE STAFF AT SHERIDAN HIGH SCHOOL WHO CHOSE ME OUT OF A LIST OF STUDENTS TO BE HERE AND SPEAK OUT AT THIS MEETING TODAY.
I'M VERY GRATEFUL TO HAVE BEEN GIVEN THIS OPPORTUNITY.
THIS IS AN AMAZING EXPERIENCE FOR A STUDENT LIKE ME TO HAVE.
I'M ALSO VERY GRATEFUL THAT THE DISTRICT ALLOWS US TO HAVE A SCHOOL LIKE SHANNON.
FOR OTHERS WHO ARE SIMILAR TO ME AND DON'T FIT IN WELL INTO THE THREE MAIN HIGH SCHOOLS.
SHANNON IS A PLACE TO GROW AND FEEL COMFORTABLE.
CHEYENNE IS A PLACE TO GROW AND FEEL COMFORTABLE THROUGH AND THROUGH WITH AMAZING TEACHERS WHO ALWAYS ARE WANTING TO GET TO KNOW US. AND THEY ALWAYS STRIVE TO MAKE SURE THAT WE'RE DOING THE BEST THAT WE CAN.
I WOULD LIKE TO SHARE A QUOTE BY JOHN C MAXWELL.
TEACHERS. STUDENTS DON'T CARE WHAT TEACHERS KNOW.
STUDENTS DON'T CARE HOW MUCH TEACHERS KNOW UNTIL THEY KNOW HOW MUCH THAT THEY CARE.
THIS IS EXACTLY WHAT GOING TO SHANNON FEELS LIKE.
I'M SO SORRY. ALL OF THE TEACHERS EMBODY THIS STATEMENT.
SHANNON IS A SAFE PLACE TO BE.
THANK YOU FOR BEING HERE. GOOD JOB.
[00:05:03]
THANK YOU. STUDENTS FROM SHANNON.WE GET TO GO TO FOUR GRADUATIONS EVERY YEAR IN THE SPRING.
SHANNON IS ALWAYS ONE OF MY FAVORITES BECAUSE THE IMPACT WE'RE MAKING UPON KIDS IS AMAZING.
DON'T GET ME WRONG, I LIKE RICHLAND, BIRDVILLE AND HALTOM TOO, BUT SHANNON HOLDS A SPECIAL PLACE IN A LOT OF OUR HEARTS OF HOW WELL THE THINGS THAT THEY'RE DOING THERE ARE MAKING A DIFFERENCE IN KIDS LIVES EVERY DAY.
WE'LL GO TO OUR NEXT TO OUR AWARDS AND RECOGNITIONS.
[F. AWARDS AND RECOGNITIONS]
OUR FIRST PARTNER IN EDUCATION AWARD.MR. THOMAS, YOU WANT TO INTRODUCE THIS? I WOULD BE GLAD TO AT THIS TIME.
MR. PHIL BECKMAN WILL COME AND LEAD US IN THIS RECOGNITION.
PARTNERS IN EDUCATION IS PLEASED TO RECOGNIZE ACADEMY FOR WITH US IS EXECUTIVE DIRECTOR JOHN SHEARER, ALONG WITH OTHER ACADEMY FOR STAFF IN COLLABORATION WITH LOCAL CHURCHES AND COMMUNITY PARTNERS.
THROUGH THE DEDICATION OF ACADEMY, FOUR STUDENTS ARE GIVEN THE INVALUABLE OPPORTUNITY TO CONNECT WITH MENTORS WHO INSPIRE, GUIDE, AND EMPOWER THEM TO REALIZE THEIR DREAMS. THE RIPPLE EFFECTS OF THEIR WORK ARE FELT NOT ONLY IN ACADEMIC ACHIEVEMENTS, BUT ALSO IN THE CULTIVATION OF CHARACTER AND AMBITION.
OUR NEXT PRESENTATION IS RICHARD HAAS, THE AWARD WINNING RICHMOND HIGH SCHOOL HONORS BAND.
PRESIDENT DAVIS AND BOARD MEMBERS, DR.
THE HONOR BAND CONTEST CONSISTS OF HIGH SCHOOL BAND DIRECTORS SUBMITTING RECORDINGS OF THEIR CONCERTS FROM THE PREVIOUS SPRING AND JUDGING PANELS ANONYMOUSLY EVALUATING THESE RECORDINGS.
THERE ARE 251 FIVE-A HIGH SCHOOLS IN THE STATE OF TEXAS.
74 OF THEM CHOSE TO ENTER THIS COMPETITION AND ONLY 20 OF THEM WERE ADVANCED TO THE SEMIFINAL ROUND.
THAT ROUND WAS THOSE 20 BANDS.
RECORDINGS WERE JUDGED THIS PAST JULY AT THE TEXAS BAND ASSOCIATION BANDMASTERS ASSOCIATION CONVENTION IN SAN ANTONIO, WITH THE TOP TEN BANDS ADVANCING TO FINALS.
I HOPE THAT YOU HAVE THAT INFORMATION IN YOUR PACKET.
THIS PLACES THEM IN THE TOP 4% OF FIVE-A HIGH SCHOOLS IN THE STATE OF TEXAS.
WE'D LIKE TO RECOGNIZE HIM TONIGHT.
WE HAVE SEVERAL SENIOR MEMBER STUDENTS WHO ARE IN THE BAND AND EACH ONE OF THESE KIDS THAT YOU'RE LOOKING AT PERFORMED AT LEAST ONE SOLO IN THAT PERFORMANCE THAT GOT THEM TO THAT FINAL ROUND LANDRY DUHON, MALIA GREER, AUDREY HERMAN AND IRINA LOPEZ. AND WE'D ALSO LIKE TO RECOGNIZE OUR AWESOME BAND DIRECTORS, MR. MIKE PICKEREL, ANTHONY RIVERA, PAYTON GRUNSKY AND THEIR PERCUSSION DIRECTOR WHO COULDN'T BE WITH US TONIGHT.
ALSO THEIR AUXILIARY BAND DIRECTOR.
THEIR PRINCIPAL RIGHT HERE, AUXILIARY BAND DIRECTOR, THE RICHLAND HIGH SCHOOL BAND.
[00:10:01]
THANK YOU.AND MR. DAVIS, BRIDGESTONE HAS WON THIS AWARD FIVE OUT OF THE LAST TEN YEARS.
IS THAT RIGHT? WELL, I'D HAVE TO LOOK.
ANYTHING HAPPEN TO THE MARCHING BAND LATELY? I DON'T KNOW. I'VE BEEN OUT OF THE LOOP.
I THINK WE'RE FIXING TO RECOGNIZE THAT NEW MEXICO.
YOU ALL KIND OF TOOK IT OVER LAST WEEKEND, RIGHT? YEAH. CHAMPIONS. VERY GOOD.
IT WAS BANDS OF AMERICA COMPETITION.
HE CAN DO IT. GO TO THE MICROPHONE.
CAUSE THAT WAY IT PICKS IT UP FOR THE RECORDING.
BANDS OF AMERICA IS AN ORGANIZATION THAT HOSTS REGIONALS THROUGHOUT THE COUNTRY THAT ATTRACTS SOME OF THE MOST ELITE ENSEMBLES, NOT JUST FROM THE STATE OF TEXAS, BUT FROM ALL ACROSS THE NATION.
AND SO WHILE WE COMPETED WITH BANDS FROM TEXAS AND NEW MEXICO, AND I'M WONDERING IF THERE WAS ONE OTHER STATE REPRESENTATIVE OR NOT, THIS INCLUDED GROUPS THAT HAVE BEEN NATIONALLY RECOGNIZED AS WELL IN OTHER VENUES AND IN MARCHING BAND FOR THEIR PERFORMANCE.
AND IT'S VERY RARE AND VERY DIFFICULT TO DO.
SO WE'RE SUPER PROUD OF THOSE STUDENTS THAT YOU JUST MET.
SO WE HAVE A LOT OF STUDENTS HERE THAT WE'RE VERY PROUD OF.
THANK YOU. THANK YOU. CONGRATULATIONS.
WHAT KIND OF HOURS OF WORK THEY PUT IN IS AMAZING.
BUT WE GET TO SEE YOU ON FRIDAY NIGHTS AT THE GAMES AND IT'S PAID OFF.
YOU'RE VERY GOOD. YOU'RE VERY GOOD AT WHAT YOU DO.
AND THEY DO IT ON A PARKING LOT, A HOT PARKING LOT.
WE TRIED TO GET YOU AN INDOOR FACILITY BUT DIDN'T WORK OUT.
OKAY. AT THIS TIME, MR. DAVIS, DR. CLARK WILL DO OUR LAST RECOGNITION FOR US.
THIS IS ALWAYS A GOOD TIME WHEN WE RECOGNIZE OUR STUDENTS.
AND I'M PROUD TO SAY THAT BIRDVILLE IS WANTING TO RECOGNIZE BIRDVILLE HIGH SCHOOL, HALTOM HIGH SCHOOL AND RICHLAND HIGH SCHOOL FOR BEING NAMED IN THE US NEWS AND WORLD REPORT 2023-24 BEST HIGH SCHOOLS RANKING.
THESE SCHOOLS HAVE DEMONSTRATED EXCEPTIONAL EDUCATIONAL QUALITY, EARNING THEIR PLACE AMONG THE BEST US HIGH SCHOOLS IN BOTH THE STATE AND NATIONAL LEVELS.
THE DISTINCTION OF BEING AMONG THE BEST PUBLIC HIGH SCHOOLS NOT ONLY REFLECTS THEIR COMMITMENT TO ACADEMIC EXCELLENCE, BUT ALSO THEIR DEDICATION TO NURTURING STUDENTS PASSIONS AND GUIDING THEM TOWARD THEIR COLLEGE AND CAREER ASPIRATIONS.
US NEWS THOROUGHLY EVALUATES PUBLIC SCHOOLS ACROSS ALL 50 STATES AND THE DISTRICT OF COLUMBIA FOR THE 2324 BEST HIGH SCHOOL RANKINGS, AN EXHAUSTIVE PROCESS ENCOMPASSING 17,680 ELIGIBLE SCHOOLS AND ONLY THE TOP 40% ARE NAMED IN THIS PRESTIGIOUS LIST.
SO CONGRATULATIONS TO BIRDVILLE HALTOM AND RICHLAND HIGH SCHOOLS.
AND I WOULD LIKE TO ASK THE PRINCIPALS, DR.
KRISTI STRICKLAND AT HALTOM, DR.
MR. TIM DRYSDALE AT BIRDVILLE HIGH SCHOOL, AND MR. KYLE KEARNEY FOR FROM RICHLAND HIGH SCHOOL.
LORD. THEY WANT A PICTURE WITH ALL OF US DOWN THERE, I THINK.
[00:15:07]
[INAUDIBLE] .YOU KNOW, ONE OTHER COMMENT ABOUT THAT AWARD.
SO THAT IS A PHENOMENAL OPPORTUNITY FOR US TO BE ABLE TO RECOGNIZE EVERYBODY AT THE SAME TIME.
GOOD JOB. YOU CAME FROM RIGHT HERE.
YEAH. THANK YOU FOR JOINING US TONIGHT FOR THAT PORTION OF THE MEETING.
WE WILL NOW PROCEED TO THE NEXT ITEM ON OUR AGENDA.
[H. PUBLIC HEARING]
IT'S A PUBLIC HEARING TO MOVE.WE'LL MOVE INTO A PUBLIC HEARING ON THE 2023 ANNUAL FIRST REPORTS.
MISS BOWMAN. THANK YOU, PRESIDENT DAVIS.
SO JUST A BRIEF OVERVIEW OF FIRST.
FIRST, THE ACRONYM STANDS FOR THE FINANCIAL INTEGRITY RATING SYSTEM OF TEXAS.
IT WAS CREATED BY TIA IN 1999, AND IT WAS AMENDED ALSO IN 2013.
THE RATING CALCULATIONS FOR THIS YEAR'S RATING ARE BASED ON DATA FROM THE 2122 FISCAL YEAR.
THE OBJECTIVES OF THE PROGRAM ARE TO ACHIEVE QUALITY PERFORMANCE IN THE MANAGEMENT OF SCHOOL DISTRICT FINANCIAL RESOURCES TO ASSESS THE QUALITY OF THOSE FINANCIAL RESOURCES AND HOW SCHOOL DISTRICTS SPEND THOSE FUNDS TO MEASURE AND REPORT THE EXTENT TO WHICH FINANCIAL RESOURCES ARE ALLOCATED FOR INSTRUCTION.
TO FAIRLY EVALUATE THE QUALITY OF MANAGEMENT DECISIONS AND TO OPENLY REPORT TO THE GENERAL PUBLIC.
SCHOOL DISTRICTS ARE ASSIGNED A RATING UNDER THE FIRST SYSTEM A, B, C, OR F, AND ONCE AGAIN, BIRDVILLE ISD HAS RECEIVED AN A RATING WITH A SCORE OF 96 OUT OF 100.
OUR FIRST REQUIREMENTS ARE PUBLIC HEARING WITHIN TWO MONTHS OF THE FINAL RATING.
OUR FIVE ADDITIONAL DISCLOSURES THAT WE ARE REQUIRED TO POST AND TALK ABOUT ARE THE SUPERINTENDENT'S EMPLOYMENT CONTRACT REIMBURSEMENTS, OUTSIDE COMPENSATION AND GIFTS RECEIVED BY EITHER SCHOOL BOARD MEMBERS OR THE SUPERINTENDENT AND BUSINESS TRANSACTIONS BETWEEN THE SCHOOL DISTRICT AND BOARD MEMBERS.
THEY ARE ALL FROM THE 21-22 FISCAL YEAR.
AND AGAIN, ONCE AGAIN, THIS IS DUE PRIMARILY DUE TO THE LEADERSHIP DR.
STINSON AND KATIE BOWMAN PROVIDES THE DISTRICT AND THEIR FINANCIAL MANAGEMENT GUIDANCE.
ARE THERE ANY COMMENTS OR QUESTIONS FROM THE BOARD? NOPE. SEEING NONE.
ARE THERE ANY PERSONS THAT ARE PRESENT TONIGHT WHO WOULD LIKE TO SPEAK REGARDING THE FIRST REPORT? IF SO, PLEASE COME FORWARD.
I'LL DECLARE THE PUBLIC PUBLIC HEARING PORTION OF THIS MEETING CLOSED.
WE'LL GO TO ITEM I ARCHITECT UPDATE PRESENTATION TO THE BOARD.
[I. PRESENTATIONS TO THE BOARD]
MISS BOWMAN, YOU MAKE AN INTRODUCTION, PLEASE.[00:20:03]
THANK YOU, PRESIDENT DAVIS AND DR.STINSON AND MEMBERS OF THE BOARD.
YOU HAVE MOLANDER ON THE AGENDA TONIGHT FOR YOUR REVIEW AND APPROVAL FOR OUR GMP OR GUARANTEED MAXIMUM PRICE FOR OUR BUDGET TO ACTUALLY GET STARTED WITH THE CONSTRUCTION OF MOLANDER WITHIN THE NEXT MONTH.
THAT'S GOING TO BE THE PROJECT PROJECT MANAGER FOR FOR THE MOLANDER ELEMENTARY SCHOOL.
WE WENT THROUGH THE WHOLE MULLENDORE BID PROCESS, HAD HUNDREDS OF BIDS COME IN AND TOOK OVER A MONTH TO PROCESS, CHECKING FOR SCOPE, CHECKING TO MAKE SURE THAT THEY WERE COVERED, THEY HAD THE CAPACITY, THEY HAD THE SCHEDULING TIMEFRAME.
AND SO I THINK WHAT YOU SEE BEFORE YOU IS A REALLY GREAT BID AND GREAT PLAN.
WE HAVE THE TURF AND PRESSBOX GOING RIGHT NOW.
YOU MAY HAVE SEEN IT ALL THREE HIGH SCHOOLS UPCOMING PROJECTS.
I HAVE SMITH ELEMENTARY AS AN UPCOMING PROJECT.
ACTUALLY, THE DEMOLITION IS HAPPENING NOW, BUT WILL COME TO A BID FOR YOU GUYS IN NOVEMBER.
THIS TAKES US THROUGH NEXT SUMMER AND THEN LONGER FOR SOME ONGOING PROJECTS.
I'LL START WITH THESE AND JUST TAKE YOU THROUGH THEM.
BOB GRIGGS HIGH SCHOOL AND LINDA KUNKEL SPECIALIZED LEARNING CENTER.
WE STARTED AT OUR CONSTRUCTION.
YOU'LL SEE THAT THE CONSTRUCTION BUDGET AND THE WAS 21,613 AND WE HAD 21,601 FOR WE WERE $12,000 UNDER BUDGET DURING THAT TIME.
BUT ALL IN ALL THE PROJECTS MOVING FORWARD, WE'VE HAD A FEW ISSUES HERE AND THERE, BUT MET WITH THEM THIS WEEK AND SO WE'RE STILL MOVING AND WE'RE STILL HOPEFUL THAT WE'LL MEET THE JULY 15TH, 24 DEADLINE.
MULLENDORE. THIS IS THE BIG ONE FOR TONIGHT.
YOU'LL SEE OUR CONSTRUCTION BUDGET WAS SET AT 47 FOR 48.
OUR GMP OR GUARANTEED MAXIMUM PRICE IS 44 363.
SO WE ARE UNDER BUDGET APPROXIMATELY A LITTLE OVER $3 MILLION ON THIS PROJECT.
AND LET ME JUST TALK ABOUT THE PROCESS WE WENT THROUGH.
AND THIS IS THE SAME THING DAVID E SMITH IS GOING THROUGH RIGHT NOW.
SO ALL ALONG THE WAY, THE LEE LEWIS WAS TALKING TO VENDORS AND SUBCONTRACTORS AND GETTING ACTUAL PRICING FROM THEM FOR THE WAY THAT WE WERE PUTTING THIS TOGETHER. SO THE ULTIMATE GOAL IS ON BID DAY.
AND THAT'S THEORETICALLY THAT'S THE WAY IT'S SUPPOSED TO WORK AND THAT'S THE WAY IT DID WORK.
AND SO WITH THAT, WHAT EXACTLY WHAT YOU SAW AT 100% IS WHAT WAS BID.
AND THERE WERE NO CHANGES, NO ALTERNATES.
AND SO YOU HAVE 100% BASE BID AS THAT.
AND WITH YOUR APPROVAL TONIGHT, WE'LL COMMENCE CONSTRUCTION ON APPROXIMATELY THE 15TH OF NEXT MONTH AND YOU'LL HAVE A THREE 1525 SUBSTANTIAL COMPLETION AND IT'LL BE DONE AND WE'LL BE MOVING IN FOR THE SUMMER FOR FALL OF 25.
SO WE STARTED THAT PROJECT WITH A BUDGET OF 12,000,541.
NOT ONLY HAVE WE BEEN ABLE TO PUT THIS PROJECT IN PLAY, BUT ALSO THAT INCLUDES THE GEO INFIELD.
SO FOR THE COOLING INFIELD, JUST LIKE WE DID AT THE FOOTBALL FIELD.
[00:25:02]
SO THIS MAKES THIS A DEFINITELY A 12 MONTH FIELD THAT KIDS CAN USE ALL SUMMER WITHOUT EXTRA HEAT THAT THEY'RE FACING AS WELL.AS WE PUT SOME CONCRETE IN SOME AREAS BETWEEN THE LIKE THE DRESSING ROOMS AND THE FIELDS.
SO THERE WON'T BE TRACKING MUD BACK AND FORTH ON THE FIELDS.
SO IT'S GOING TO BE A REALLY NICE PROJECT AND SOME FENCING.
SO THE FIELDS ARE GOING TO BE REALLY NICE AND I'M LOOKING FORWARD TO THOSE.
SUBSTANTIAL COMPLETION IS SCHEDULED FOR DECEMBER 1ST.
SO AND THEY'RE ALL SUPPOSED TO BE DONE BY DECEMBER 1ST.
WE ACTUALLY DISCUSS SCHEDULES THIS MORNING.
DEMOLITION IS HAPPENING RIGHT NOW AND GUARANTEED MAXIMUM PRICE IS PLANNED TO COME TO THE BOARD IN NOVEMBER AT YOUR NOVEMBER BOARD MEETING.
THAT WITHIN THE BUDGET WE'RE GOING TO BE ABLE TO HAVE THE CONSTRUCTION, THE DEMOLITION, PLUS THE COST OF THE TRANSITION FROM FRANCISCO TO DAVID INCLUDED IN THE BUDGET.
WE THINK WE'RE GOING TO BE ABLE TO ABSORB ALL OF IT WITHIN THE EXISTING BUDGET.
SO I KNOW WE WERE CONCERNED ABOUT THE BEGINNING OF THAT WITH THE ADDITIONAL TRANSITION COSTS, BUT WAS LOOKING I THINK WE'RE GOING TO BE ABLE TO ABSORB IT ALL AND THAT'S GOING TO BE GREAT. AND SO WE SHOULD BE IN GOOD SHAPE WITH THAT SAME BASICALLY TIME FRAME.
WE'LL START IN DECEMBER, SUBSTANTIAL COMPLETION FIVE ONE.
SO IT'S GOING TO BE RUNNING ABOUT A MONTH AND A HALF BEHIND OF MULLENDORE AND THAT'LL BE GREAT.
THAT'S A SCHEDULED TO COME TO YOU IN JANUARY.
WE ACTUALLY HAD A MEETING THIS WEEK AND THERE'S A CHANCE THAT MAY BE COMING TO YOU IN DECEMBER.
WE'RE ALMOST A MONTH AHEAD ON PLANS, BUT IN WORKING WITH THE PRINCIPAL, WE'RE ACTUALLY GOING TO START THAT SPRING BREAK AND RUN IT THROUGH THE SUMMER AND BE READY FOR THEM WHEN SCHOOL STARTS NEXT FALL.
SO THAT'S KIND OF OUR CURRENT PLAN.
THIS IS PROBABLY ONE OF OUR MORE COMPLICATED PROJECTS THAT WE'VE GOT GOING ON, BUT THIS IS A PLANNING TO COME TO YOU GUYS IN FEBRUARY WITH PRICING COMMENCE CONSTRUCTION BEGINNING OF APRIL.
AS YOU KNOW, WE HAVE SOME NEW CONSTRUCTION, INCLUDING THE CHEERLEADING AND THE DRILL TEAM AREA.
THAT'S GOING TO BE THE NEW PART OF THE BUILDING THAT WILL COMMENCE IMMEDIATELY.
THEN WE'LL HAVE A SUMMER PHASE.
SOME WILL BE GOING ON IN THE SCHOOL YEAR AND THEN THE FOLLOWING SUMMER PHASE.
WE'VE BEEN WORKING WITH PRINCIPAL HALTOM HIGH SCHOOL AND LOOKING AT PHASING, LOOKING AT SCHEDULING AND TRYING TO WORK AND MAKE SURE THAT WE STAY OUT OF THEIR WAY AS BEST WE CAN TO GET THIS DONE FOR THEM.
BUT YOU'LL SEE SUBSTANTIAL COMPLETION ON AUGUST OF 25.
WE'RE LOOKING AT PUTTING ON FOUR ROOFS NEXT SUMMER FOR ELEMENTARIES.
THE ACADEMY AT THOMAS WALKER CREEK, NORTH RIDGE ELEMENTARY AND SPICER ELEMENTARY.
THESE WILL BE NEW ROOFING, NEW MODIFIED BITUMEN ROOFING.
AND SO WE'VE ACTUALLY WALKED THOSE ROOFS ARE WORKING ON PLANS NOW.
AND SO WE'LL BE GETTING READY TO GO FOR NEXT SUMMER.
ALSO COMING TO YOU IN DECEMBER, WE PHASE ONE OF OUR AIR CONDITIONING HVAC UPDATE.
THIS IS A LEED LOUIS PROJECT THAT HE'LL BE WORKING ON WITH US RIGHT NOW.
AND SO WE'LL BE WORKING ON THAT WITH THE PARTICULAR CAMPUSES THAT YOU SEE.
AND THAT WILL BE DONE BY THE END OF THE SUMMER.
AND SOMETIMES IN EARLY SPRING WE'LL BE FOLLOWING THE PHASE TWO OF HVAC.
WE'RE WORKING ON THAT AS WELL.
THE SUMMER. THIS NEXT SUMMER, WE'RE ALSO GOING TO BE DOING PAINTING AND FLOORING.
WE'LL BE WORKING ON THOSE AND BRINGING THEM TO BID TO YOU IN FEBRUARY.
SO THAT'S THE PLAN AND WORKING WITH TIM.
AND HE'S IN AGREEMENT THAT WE GET ALL THIS DONE AND GET IT OUT OF THE WAY.
SO NOT MUCH GOING ON AROUND HERE, BUT WE'RE STAYING BUSY.
I'VE AGAIN, I CAN'T SAY ENOUGH HOW MUCH I ENJOY WORKING WITH LEE LEWIS.
[00:30:05]
THEY'RE DOING A GREAT JOB FOR THE DISTRICT.AND WITH THE ARCHITECTS AND CONTRACTORS, EVERYTHING IS MOVING ALONG.
CAN I ANSWER ANY QUESTIONS? BOARD? MR. TOLBERT, GO AHEAD. I WAS ALSO GOING TO SAY I APPRECIATE THE ARCHITECT'S ESTIMATES COMING IN.
YOU DON'T WANT TO GO TO THE VOTERS SAY IT'S GOING TO BE Y AND THEN TURN ABOUT X PLUS A BUNCH.
YOU WANT IT TO BE UNDER X IF AT ALL POSSIBLE.
THAT'S GREAT. AND SO EVERYTHING'S MOVING ALONG.
THE SQUARE FOOTAGE COST IS OBVIOUSLY HIGH, BUT I CAN REMEMBER THE DAY WHEN WE THOUGHT 100 WHEN I WAS BUILDING A HIGH SCHOOL BACK ABOUT 2010 AND WE WERE WRINGING OUR HANDS OVER ABOUT $160 A FOOT.
MR. DILKS WHEN WE TALKED ABOUT MOLANDER, I THOUGHT WE WERE USING THE BIRDVILLE ELEMENTARY PLANS.
IT LOOKS LIKE A IT'S A FOLLOWING.
IT'S TIED INTO THE CHENEY HILLS PLAN WITH SOME OF THE THAT'S WHERE IT STARTED.
AND I THINK WE FLIPPED IT A LITTLE DIFFERENT, BUT IT'S PRETTY MUCH TIED INTO THAT.
IS THAT'S NOT WHAT I WAS TOLD.
I'M CONCERNED ABOUT THE WALLS, THE GLASS WALLS VERSUS THE.
WELL, NOW THE I KNOW THAT WHAT I DO KNOW AS FAR AS WITH THE SAFETY ELEMENTS PUT IN, WITH THE IMPACT RESISTANT FILM, THE ALL THAT'S PUT IN, THEY DO HAVE GLASS WALLS COMING INTO THE CLASSROOMS, AS WE PREVIOUSLY TALKED ABOUT.
BUT THAT'S KIND OF WHAT'S FOLLOWING THAT LINE, IS MY UNDERSTANDING.
AND NOW I FIND OUT THAT IT'S THE MAJOR CHENEY ELEMENTARY FORMAT.
MY PROBLEM WITH THE GLASS WALLS, AND I UNDERSTAND THAT REGULAR WALLS DON'T HAVE ANY MORE RESISTANCE THAN A GLASS WALL.
MY PROBLEM WITH IT IS IT'S DISTRACTING TO THE STUDENTS.
THERE WAS DISCUSSION WHEN WE SURVEYED TEACHERS AND THERE WERE JUST AS MANY MR. DILKS THAT WANTED THE OPENNESS AND WANTED THE WALLS.
IF I REMEMBER CORRECTLY, IT'S BEEN DEBATED.
I'M TRYING TO REMEMBER AS WELL, MR. DILKS, IF I REMEMBER CORRECTLY, AND YOU GUYS LET ME KNOW IF I'M WRONG.
THERE WAS A COMPROMISE IN THAT AS WELL.
AND IN THE IN CHENEY, THERE WERE A CERTAIN AMOUNT OF GLASS IN THE WALLS, THREE PANELS, I'M THINKING.
AND IN THIS NEW BILL, THERE'S ONLY ONE.
SO THERE WAS, I THINK, SIGNIFICANT COMPROMISE.
MR. DILKS TO TAKE INTO ACCOUNT.
I DO KNOW THAT THERE IS LESS GLASS THAN THE PREVIOUS WALL.
IT WAS MY RECOLLECTION WE'RE GOING TO HAVE LESS GLASS AND WE WERE GOING TO HAVE THE ABILITY FOR TEACHERS THAT DIDN'T WANT THAT DISTURBANCE TO JUST PULL A CURTAIN AND JUST GOT EVERY ONE OF THEM HAD THE CURTAIN BUILT IN THAT CAN BE USED.
AND THE MAIN HALL IS NOT BUILT LIKE MAJOR, LIKE CHENEY HILLS.
IT IS BUILT MORE AND DESIGNED MORE LIKE BIRDVILLE ELEMENTARY, WITH WHERE THE CLASSROOMS OPEN INTO A COLLABORATION THAT IS BLOCKED OFF FROM THE MAIN HALL.
I THINK THAT IN GOING BACK, I'M TRYING TO I'M SORRY.
I'M TRYING TO REMEMBER AS WE SPOKE, IT'S BEEN A WHILE.
BUT THEY TOOK THE BEST OF BOTH WORLDS FROM THAT SURVEY.
THE TEACHERS TOLD US WHAT THEY LIKED ABOUT EACH OF THOSE CAMPUSES AND TRIED TO MODEL AFTER THAT.
AND I THE WAY I UNDERSTOOD IT WAS MULLENDORE WAS GOING TO BE LIKE BIRDVILLE ELEMENTARY.
OR I WOULD HAVE SAID MORE ABOUT MULLENDORE ELEMENTARY WHEN WE WERE THERE.
ANY COMMENTS DOWN HERE OR QUESTIONS FOR MR. DOCTOR? ALL RIGHT.
THANK YOU, SIR. ITEM I TWO IS HOUSE BILL THREE BOARD GOALS.
[00:35:02]
DR. CLARK. THANK YOU, MR. DAVIS. IN ACCORDANCE WITH HOUSE BILL THREE SCHOOL BOARD'S ADOPTED PLANS IN EARLY CHILDHOOD LITERACY AND MATH, AS WELL AS COLLEGE CAREER AND MILITARY READINESS.PART OF THIS REQUIREMENT INCLUDES AN ANNUAL REVIEW BY THE BOARD.
AT A PUBLIC MEETING TONIGHT, DR.
GOOD EVENING. THIS WILL BE RATHER SHORT.
WE START WITH EXCUSE ME, THE THIRD GRADE REGARDING READING LITERACY.
AND WE HAVE EXCUSE ME, AN INCREASE FROM 45% TO 60% BY 2024.
SO WHAT YOU'LL SEE IN THE PARENTHESES WAS THE ACTUAL VERSUS WHAT WAS SCHEDULED.
AND SO THEREFORE, IN 2022, THERE WAS AN ADJUSTMENT MADE.
YOU WILL NOTICE THAT IN SPRING 2023 WE HAD 51% WAS THE ACTUAL.
I DO WANT TO NOTE A REMINDER THAT THE SPRING 2023 ASSESSMENT WAS SIGNIFICANTLY CHANGED.
IT IS NO LONGER A READING ASSESSMENT.
SO AS A RESULT, THE GOAL HAS REMAINED THE SAME.
THE MATHEMATICS FOR THIRD GRADE WAS 48 TO 54% AND AGAIN THE GOALS WERE UPDATED IN FALL 2022.
THE LAST ONE IS THE CMR COLLEGE CAREER MILITARY READINESS.
BUT LAST YEAR IN 2022 WE HAD 63.
OUR ACTUAL WAS 58 AND AGAIN ENDING IN 2024 AT 65%.
ANY QUESTIONS? ANY QUESTIONS? FOR DR. UPHOFF? THANK YOU FOR THAT INFORMATION.
[J.1. Textbook Proclamation Advisory Committee [Dr. Elizabeth Clark, Associate Superintendent]]
DR. CLARK, THIS YEAR, AS IN YEARS PAST AND IN CONJUNCTION WITH POLICY STATEMENT FOR LOCAL, THE BOARD IS REQUIRED TO APPROVE THE OFFICIAL TEXTBOOK ADOPTION COMMITTEE IN YOUR BOARD MATERIALS.YOU HAVE BEEN PRESENTED WITH A LIST OF THE TEXTBOOKS THAT ARE INCLUDED WITHIN PROCLAMATION 2024 AND THE STATE BOARD ADOPT MATERIALS FOR DISTRICTS TO CONSIDER IN, AND THEY WILL DO THAT IN NOVEMBER OF 23.
WE KNOW THE CONTENT AREAS AND THAT INCLUDES A SCIENCE IN GRADES K THROUGH 12 TECHNOLOGY APPLICATIONS, GRADES K THROUGH EIGHT, PERSONAL FINANCIAL LITERACY AND ECONOMICS AND SEVERAL CTE COURSES.
TONIGHT WE ARE SIMPLY PRESENTING TO THE BOARD THE PROPOSED MEMBERS OF THE 2324 OFFICIAL ELEMENTARY AND SECONDARY TEXTBOOK COMMITTEE, WHICH ARE REPRESENTATIVE OF TEACHERS IN THESE PARTICULAR CONTENT AREAS.
HOWEVER, THEY WILL BE WORKING WITH TEACHERS THROUGHOUT THE CAMPUS AND THEIR DISTRICTS, I MEAN THEIR CAMPUS, TO GET INPUT FROM TEACHERS OTHER THAN THE ONES THAT ARE ON THE COMMITTEE.
TEACHERS WILL BE INVITED TO ATTEND TEXTBOOK HEARINGS AND TO VIEW THE MATERIALS BEING CONSIDERED.
UPHOFF IS ALSO OVERSEEING THIS PROCESS.
[J.2. Proposed Campus Improvement Plans (CIP) [Dr. Elizabeth Clark, Associate Superintendent]]
DR. CLARK THANK YOU.I HAVE A LOT RIGHT HERE, DON'T I? OKAY. TONIGHT, THE DISTRICT IMPROVEMENT PLAN, WHICH IS A DISCUSSION ACTION ITEM, IS REALLY THE PLAN THAT IS USED TO ALIGN ALL OF THE CAMPUS IMPROVEMENT PLANS WHICH HAVE BEEN MADE AVAILABLE IN YOUR BOARD PACKET AS A SEPARATE INFORMATION AND DISCUSSION ITEM.
THESE PLANS ARE DEVELOPED WITH A LOT OF INPUT FROM DISTRICT LEVEL LEADERS, DIRECTORS LOOK AT THOSE PLANS AND CHECK FOR COMPLIANCE TO MAKE SURE THAT ALL OF THE REQUIREMENTS THAT MUST BE IN A PLAN ARE INCLUDED.
[00:40:02]
PLANS, THEY WILL HAVE AN OPPORTUNITY BETWEEN NOW AND NEXT MONTH TO MAKE THOSE CHANGES.HOWEVER, FOR RIGHT NOW, JUST WANTED YOU TO HAVE ACCESS TO THESE PLANS TO KNOW THAT THE CAMPUSES HAVE BEEN WORKING ON THEM SINCE THE SUMMER, AND THAT NOW THAT THE DISTRICT IMPROVEMENT PLAN HAS GONE BEFORE THE COMMITTEE, WHICH WE MET LAST TUESDAY, I MEAN, LAST MONDAY TO REVIEW THE DISTRICT IMPROVEMENT PLAN WITH THEM, AND IT WILL BE PRESENTED TONIGHT AS AN ACTION ITEM THAT REALLY KIND OF FINALIZES THE PIECE THAT CAMPUS NEEDS AS THEY CONTINUE TO DEVELOP THEIR PLANS FOR FINAL APPROVAL.
CLARK? ALSO, REMIND THE BOARD THAT WE DO HAVE A CAROUSEL ON OCTOBER THE 19TH WHERE WE WILL BE HEARING SOME OF THE THE CAMPUS PLANS, IMPROVEMENT PLANS. I THINK IT SAYS BIRDVILLE.
YOU'LL BE READY. HALTOM, MIDDLE, SPICER, HARDMAN AND CHENEY HILLS ELEMENTARY SCHOOLS.
SO THE BOARD WILL HAVE THAT WORKSHOP CAROUSEL ON OCTOBER 19TH.
WE'LL NOW MOVE INTO SEPARATE ACTION ITEMS.
[K.1. Consider Personnel Items as Discussed in Closed Session]
FIRST ITEM WILL CONSIDER PERSONNEL ITEMS. BUT BEFORE WE CONSIDER THOSE PERSONNEL ITEMS, I WANTED TO ANNOUNCE, DR.STINSON HAS ACCEPTED FIVE RESIGNATIONS AND FOUR RETIREMENTS.
DO I HEAR A MOTION FOR THE PERSONNEL ITEMS? I MOVE THE BOARD, APPROVE AND ADOPT ALL PERSONNEL ITEMS AS RECOMMENDED BY THE SUPERINTENDENT AND DISCUSSED IN CLOSED SESSION MOTION.
MR. KUNKEL, IS THERE A SECOND? I'LL SECOND. SECOND BY MR. DREES. ANY QUESTIONS, COMMENTS OR FROM THE BOARD? ALL IN FAVOR OF THE MOTION SIGNIFY BY RAISED HAND.
MOTION DOES CARRY UNANIMOUSLY.
ITEM K TO CONSIDER THE 20 2324 DISTRICT IMPROVEMENT PLAN GOALS AND OBJECTIVES.
[K.2. Consider the 2023-24 District Improvement Plan (DIP) Goals and Objectives [Dr. Elizabeth Clark, Associate Superintendent]]
IS THERE A MOTION? I MOVE THE BOARD APPROVE THE 2023-24 DISTRICT IMPROVEMENT PLAN GOALS AND OBJECTIVES AS PRESENTED.THANK YOU. MR. TOLBERT. IS THERE A SECOND? SECOND, SECOND BY MR. SANDERS? WAS ANY DISCUSSION OR QUESTIONS FROM THE BOARD ALL IN FAVOR OF THE MOTION SIGNIFY BY RAISED HAND? MOTION DOES CARRY UNANIMOUSLY.
ITEM NUMBER THREE THE CONSIDER THE GUARANTEED MAXIMUM PRICE FOR MOLANDER ELEMENTARY SCHOOL REBUILD.
[K.3. Consider Guaranteed Maximum Price (GMP) for Mullendore Elementary School Rebuild [Katie Bowman, Associate Superintendent]]
IS THERE A MOTION? MR. PRESIDENT? I MOVE THAT THE BOARD APPROVE THE GUARANTEED MAXIMUM PRICE TO LEE LEWIS CONSTRUCTION, INC OF $44,363,942 FOR MOLANDER ELEMENTARY SCHOOL.PREPARED BY LOU IS IT LU LEWIS LEE LEWIS CONSTRUCTION INC AS PRESENTED.
IS THERE A SECOND, SECOND, SECOND BY MISS SANDERS WISE ALWAYS GOOD TO HEAR WHEN IT'S UNDER BUDGET.
ANY OTHER QUESTIONS OR COMMENTS? I HAVE ONE QUESTION.
WE ACTUALLY HAVE AN APPROVED GMP YET SMITH ELEMENTARY SCHOOL FOR THE DEMOLITION OF THAT PROJECT.
SO WE'RE IT'S JUST DURING DEMOLITION.
GOTCHA. SO AS SOON AS WE GET AN APPROVAL ON THIS GMP, WE'LL GET A TRAILER OUT THERE.
ALL RIGHT? MOLANDER WAS A SEPARATE CONTRACT.
GOTCHA. GOTCHA. WE HAVE A MOTION.
MR. DREES SECOND. MISS SANDERS, WAS ANY MORE DISCUSSION OR QUESTIONS? ALL IN FAVOR OF THE MOTION SIGNIFY BY RAISED HAND MOTION DOES CARRY UNANIMOUSLY AND.
MOTION CARRIES 5 TO 1 BEFORE WE CONSIDER THE CONSENT AGENDA.
FIRST ONE'S FROM GREEN VALLEY PTA, WHO DONATED $4,000 TO GREEN VALLEY ELEMENTARY AND TO J.B.
ELECTRIC, WHO DONATED $3,816.29 TO THE BECHTEL CONSTRUCTION TECH DEPARTMENT.
ON BEHALF OF THE BOARD, I WANT TO THANK THEM AND OUR SINCERE APPRECIATION FOR THESE DONATIONS.
[L. CONSENT ITEMS]
DO I HAVE A MOTION? MOVE THE BOARD. APPROVE ALL ITEMS IN CONSENT MOTION.MR. KUNKEL, IS THERE A SECOND? SECOND. MR. TOLBERT, ANY DISCUSSION OR QUESTIONS? ALL IN FAVOR OF THE MOTION SIGNIFY BY RAISED HAND MOTION CARRIES UNANIMOUSLY SUPERINTENDENT REPORTS OR REPORTS TO THE BOARD THAT HAVE BEEN PROVIDED AS INFORMATION TO
[M. SUPERINTENDENT'S REPORTS TO THE BOARD]
THE BOARD THEY MADE AVAILABLE TO THE BOARD FOR REVIEW IN OUR BOARD BOOK.DOES THE BOARD OR SUPERINTENDENT HAVE ANY COMMENTS OR QUESTIONS CONCERNING ANY OF THESE ITEMS? IF NOT, OUR NEXT REGULAR BOARD MEETING WILL BE THURSDAY, OCTOBER 26TH HERE IN THE BOARDROOM.
[N. FUTURE BOARD MEETINGS]
OPEN SESSION WILL BE BEGIN AT 7 P.M.AS WE HAVE NO FURTHER BUSINESS.
DO I HEAR A MOTION TO ADJOURN THIS MEETING? IS THERE A MOTION MOVED TO ADJOURN? SECOND BY MR. DREES. ALL IN FAVOR SAY AYE? AYE. MOTION CARRIES UNANIMOUSLY.
[00:45:01]
WE ARE ADJOURNED AT 7:44.